Gig Network to Olin 3rd Floor Posted on October 24th, 2005 by

Over the summer we added Gigabit connections to each floor in Olin hall. Near the beginning of the school year, the connection stopped working for the 3rd floor. We found the problem and put the gig link back in place today. Things should be even faster to the 3rd floor now.

 

Comments are closed.